The Ryan’s Pub Project 

Revamp Conservation

Camber Arch – 
Grade 1 Protected Structure
Camden Street
Dublin 2

This contract is still active, 

there will be more pictures added upon completion

Shown details of the process when creating a Camber Arch

To achieve this we carefully cut voussoirs to match existing brickwork and Camber arch design.

Before work had started, no scaffold. 

Brick Repairs on a 1882 Grade 1 Protected Structure

 
 
 

Shown on the right is a before and after shot.

Shown here are pictures taken before work had commenced
 

Here are examples of the brick repair.

The two following videos show the process of steam cleaning the brick.